Describing Risk: Accurate Description = Better Control

Describing Risk
The importance of describing risk accurately

When it comes to project risk management, it’s not only important to understand the definition of risk, but equally important to know how best to describe it. A badly described risk can, at best, lead to false assumptions and, at worst, result in the wrong — and completely ineffective — actions being taken to control it.

The Three Components of Risk

Risk is made up of three components,:

  • Threats or Opportunities
  • Risk Events
  • Risk Impacts

Why Accurate Description Matters: A Personal Story

To put the importance of accurate risk description into context, I would like to recount a personal experience from 1987, while competing in a national hang-gliding event.

It was a warm, sunny afternoon, with a steady 15-knot north-easterly wind. Around forty pilots had gathered at the top of a mountain for the annual spot-landing classic — a controlled landing within a 10-metre target, roughly a kilometre away and 2,000 feet below. I was lying in joint second position at the time. Around 4pm, the wind shifted to a variable north-westerly, and most pilots packed up. A few, including myself, stayed to assess conditions. A controlled landing in the outer ring of the target would be enough to win outright. After consulting with my instructor, I decided to go for it — adjusting my take-off run to compensate for the changed wind direction by shifting my weight and angling my run as steeply into the wind as I could manage. My take-off was successful and I made the landing on target, which was judged “controlled”, but only just!

Afterwards, a fellow pilot said, “Mike, you took quite a risk taking off in those conditions!” I agreed but asked what he meant by that statement. His response was: “Well, there was a big risk that you could have been killed.” At twenty years old and not well versed in risk management, that made perfect sense to me at the time. Three decades on, having spent most of my career reviewing risk descriptions, I’m a bit more critical of statements like “there’s a risk someone could get killed” — because that statement doesn’t actually describe the risk at all. It only describes one potential impact of an as-yet undefined event, triggered by an undefined threat.

Applying This to a Real Example

Which brings us to the point: as long as all three components of a risk are captured in its description, the risk has been accurately described. That means describing the threat (or opportunity) that is the source of the risk, the event that could result from it, and the consequences of that event.

Setting aside the many other threats inherent to hang-gliding in general, the immediate threat that day was a change in weather conditions. The potential risk event was crashing into the side of the mountain after take-off, and the possible consequences ranged from simply damaging the glider, to personal injury or death — and in threat-risk management, we generally focus on the worst credible outcome, which in this case was death.

An accurate description of the risk I took that day would be: “There is a risk of crashing into the side of the mountain (EVENT) because of adverse weather conditions (THREAT) which could result in death (IMPACT).”

This description clearly differentiates between the threat, the event, and the impact, which allows us to develop a mitigation plan comprising several response actions aimed at reducing both the probability of the risk event occurring and the impact, should the event occur regardless.

PROBABILITY RESPONSE ACTIONSIMPACT RESPONSE ACTIONS
Align the hang-glider into the prevailing wind as much as possible.Install safety netting along mountain face, just below and to the sides of the take-off zone.
Lean weight into windward side of the hang-glider.Wear suitable protective clothing and equipment.
Make the take-off run as fast as possible.Take out adequate life, medical, and property damage insurance policies.

Project Risk Manager builds this exact three-part structure — source, event, and impact — into every risk logged on the platform, so a team can’t accidentally skip a component even under time pressure. See how it works or book a free demo. The Basic plan is free for up to two active team members, so it costs nothing to try.